1997
- Supply of Three (3) Units UL-S 10000x10 Bar
Plus:
- Design, Supply and Installation of Smoke-Stack
- Design, Supply and Installation of Feed Water Tank
- Design, Supply and Installation of Fuel Oil Day Tank
- Supply and Installation of De-aerator
- Design, Supply and Installation of Interconnecting Piping for 3 Boilers
- Design, Supply and Installation of Steam and Condensate System of Absorption Chillers
- Commissioning of complete boiler system