INTERPHIL LABORATORIES, INC.

2004

  • Supply of One (1) Unit UL-S 3200 x 10 Bar

Plus:

  1. Installation of Boiler & Interconnecting Piping
  2. Modification of Existing Feed Water Tank
  3. Modification of Existing Smoke-Stack
  4. Commissioning of the boiler