NESTLE PHILIPPINES, PULILAN

2012

  • Supply of One (1) Unit UL-S-IE 5000 x 10 Bar

Plus:

  1. Installation of Boiler
  2. Design, Supply and Installation of Piping
  3. Commissioning of the complete system