1998
- Supply of One (1) Unit UL-S 10000 x 13 Bar
Plus:
- Supply and Installation of De-aerator
- Design, Supply and Installation of Feed Water Tank
- Design, Supply and Installation of Smoke-Stack
- Supply and Installation of Steam Header
- Commissioning of Boiler