PILIPINAS SHELL PETROLEUM CORPORATION

1993

  • Supply of Two (2) Units UL-S 7000 x 10 Bar

Plus:

  1. Supply of De-aerator
  2. Supply of feed water tank
  3. Install Deaerator and feed water Tank
  4. Fabrication, Installation of Smoke Stack
  5. Supply and installation of Water Softener
  6. Supply, Installation and test Pipe Spools for boiler house Steam System
  7. Installation and Commissioning of boiler
  8. Re-grade boiler foundation (Civil Works)