1993
- Supply of Two (2) Units UL-S 7000 x 10 Bar
Plus:
- Supply of De-aerator
- Supply of feed water tank
- Install Deaerator and feed water Tank
- Fabrication, Installation of Smoke Stack
- Supply and installation of Water Softener
- Supply, Installation and test Pipe Spools for boiler house Steam System
- Installation and Commissioning of boiler
- Re-grade boiler foundation (Civil Works)